Paper Topic:

Resource Planning and Management in Construction

Rebar fixing "-Rebar fixing for the column and beam "Steel fixers "5 "Forming "-Forming work by wooden board before concreting "Carpenters "5 "Concreting "-Clean and remove all dust / rubbishes then concreting "Laborers "5 "FLOOR SLAB "Rebar fixing "-Rebar fixing for the floor slab "Steel fixers "5 "Forming "-Forming work by wooden board before concreting "Carpenters "5 "Concreting "-Clean and remove all dust / rubbishes then concreting "Laborers "10 "Scaffolding erection "-Erecting scaffolding for the wall construction work "Scaffolders "5 "Rebar fixing "-Rebar fixing for the external wall "Steel fixers "5 "Forming "-Forming work by wooden board before concreting "Carpenters "5 "Concreting

"-Clean and remove all dust /rubbishes then concreting "Laborers "5 "Window installation "Window installation "Fitters "5 "INTERNAL PARTITION "Brick work "-Brickwork for the external wall "Bricklayers "5 "Door installation "-Door frame and door installation "Carpenters "2 "ROOF "Framework "-Framework for roof construction "Welders "10 "Roof covering "-Concrete slates "Bricklayers "10 "FINISHING "Tiling (Pool "-Tiling work for the external and internal wall "Bricklayers "5 "Tiling (House "Bricklayers "5 "Plastering "-Plastering work ceiling and internal wall "Plasterers "5 "SERVICES INSTALLATION "Drainage duct "-Install and connect for the precasted duct of the waste drainage duct at underground level "Laborers "5 "Services Trench "-Install and connect for the precast concrete trench for E M service at underground level "Laborers "5 "Cabling "-Power and lighting cable installation "Electricians "5 "Sanitary "- "Plumbers "5 "P /D Installation "Pipe work of plumbing , fittings , and drainage pipe installation "Plumbers "5 "F .S .Installation "-Fire alarm and fighting system installation "Technicians "5 "Ventilation "-Ventilation fan installation for basement and split-type "Fitters "5 "Pool system "-Pump , fittings and pipework with associated equipment "Technicians "5 "Security system "-Security control , CCTV and alarm installation "Technicians "5 "BACK FILL , PLANT AND CLEARING "Black fill "-General Black fill "Laborers "5 "Plant "-Plant for garden...

2 pages
33.5 KB
Free sing-up

Not the Essay You're looking for? Get a custom essay (only for $12.99)