Rate this paper
  • Currently rating
  • 1
  • 2
  • 3
  • 4
  • 5
5.00 / 4
views 1428 | downloads 841
Paper Topic:

Methodology Of Operational Research

Management Report

Title : The Skein Water Authority : Methodology of Operational Research

From : Author 's name

To : SWA Chairman

Date

Reference - (e .g E-mail address

Where material is presented in the form of s saved on a floppy disk names of the relevant s

Introduction

Lakes , water reservoirs and streams are the most valuable source of drinking water for the earth 's population . The lives of many people depend on both natural lakes and artificial reservoirs , which provide drinking water and water for agricultural and industrial development . In

br addition , lakes and reservoirs provide unique recreational opportunities

Water supply is very essential to one 's location especially to different people who will be able to gain access to it . But , building water reservoir makes it all different especially it concerns a lot of factors such as time , effort , location , and costs . A lot of manpower and planning are needed in to come up with a better plan for them to carry out the best solution there is

The Skein Water Authority faces a great deal of demand , its water supply . Currently , water is coming directly from outside sources . The problem lies for the future use of such . Skein Water Authority should plan on how they are going to accommodate the demands of water to be supplied and the solution to it is to make water reservoirs for them to become self sufficient

Various conflicts that needed to be carried out by different divisions

reduce the cost for water construction , there should only be cheap water available by Water Supply Division

develop Skein for leisure purpose as proposed by the River Management Division

Sewage Division opposing to increase the flow of water between Lonsdale and Furness

Water Supply division suggested to have a large reservoir on the Upper Skein Level for direct supply of water rather than to increase the flow in that area

As a Planning Officer , the SWA Chairman would like me to take an in depth look with regards to these conflicts and be able to reconcile the differences between 3 main divisions such as Water Supply Division Sewage , and River Management . Certain propositions were made by these 3 divisions that would come into one best solution that would not sacrifice each other location

FINDINGS

Water Supply Division

Expensive cost is the number one main problem for Water Supply Division in recommending having a direct water supply from upper skein . The topology and rainfall pattern is also a concern , and thus additional expenses for maintaining a relatively low flow of water is also needed

3 million pounds per year is the treatment , and supply of water for 50 m .g .d

Pertaining to the figures submitted by Water Supply Division , it is indicated that as additional water increases per 20mgd , there 's an increase also in reservoirs capacity it even doubles and triples its capacity ( refer to Appendix , figure 1

It can also be noted that a larger reservoir needed to construct , the

Aside from the proposed...

7 pages
91.0 KB
Free sing-up

Not the Essay You're looking for? Get a custom essay (only for $12.99)