Boulder Site Inspection Report TO : Stan West Westan Builders , Inc CC : Anja Wiederhausen Auto Wash Inc Dayton Ohio Re : Inspection Summary The Boulder of the project for High Gear Car and Truck Rentals (HGTCR was inspected last May 9 . Following the inspection several items were found to be in contradiction with some terms in the contract drawn Westan Builders , Inc . was not able to follow the required measurement for the cable troughs and concrete edges that were just constructed were found with rough edges . Equipment delivered by

Auto Wash , Inc . was lacking a cable wire and some items such as lamps and hook-up seals were found damaged . Possibility of robbery should be looked into
Details from inspection of construction work
Two piles of gravel and soil , broken pieces of wood , shards of metal lunch bags and drink containers , and other construction debris were found scattered about the site
Roughness of concrete edges that were constructed was found in about 20 of the work accomplished
Actual troughs measure a depth of ranging from only 1 3 /8 in . to 1 ? in and a width ranging from 1 5 /8 in . to 2 1 /8 in . as opposed to the requirement stated in the contract . Cable and wire troughs should be at least 1 5 /8 inches deep and 2 inches wide
A late fine of 500 per day will be enforced if the revisions are not finished by noon of May 12
Suggestions for completion of contracted work by Westan Builders...
More Essays on report, car, wash, Builders, Auto Wash
- Installing an Autmatic Car Wash
- Critically analyse the Panel Report -Mexico-US Measures affecting telecommunicat
- business
- Market and Social Research Report
- Summarized Review of the Report
- Movie Report
- history book report (it cannot be a novel)
- Safety Summary Report
- Write the budget report. Here is the information to write a budget report:
- Company`s financial analysis