AFI System Proposal
NMCI Project Assessment The following is my assessment of the project That when developing the project care was never taken to read carefully the set objectives and whether or not they were being met . As a result only two of them were met which indicated there was a need to overhaul the system . the less expansion continued as if nothing was wrong Modern development tools like prototyping were never used properly System users were never involved in the development as the project was only handled by the experts . As a result serious

mistakes were never detected let alone being solved in time
The size of the project needed the use of modern networking hardware fast enough to cope with the heavy traffic created by the over 650 ,000 users . Instead of replacing the obsolete old hardware with the new ones the project continued to build on them which created more disaster
The monitoring process was never put into use as the Navy personnel who appeared to have vested interest in the project kept on defending it rather than bringing correcting and useful comments during the development process . They only focused on being able to provide some service whether that service was reliable or dependable was never the issue was never an issue
The Navy system is normally classified as critical and needs special methods to minimize and tolerate some faults during its development Such methods were never used . For example reliability , safety and security assessments were never done
Performance tests were never carried even though it was clearly known such tests were mandatory . The programming languages used were never compatible with modern distributed operating systems . There was need to use Object Oriented Systems to enhance later modification compatibility
THE AFI NEW SYSTEM PROPOSAL
Introduction
Purpose of the Document
This document is prepared for use by the following people and for the following purposes
User Name Why need the Document
System Customers Check if needs are met and specify any changes that may be required
Managers / Officers To plan for the system bid and its development
System Engineers To Know and be guided on what system to develop
System test engineers To develop validation tests
System Maintenance Engineers To understand the system parts and its Scope of the Product
This system is meant to be used by the current air force staff and it will take into account their current number and the projected number in the year 2030
It will use the most current network technology including their topologies , transmission media , and distributed operating system architecture
System Overview
Why use networks
To allow for efficient sharing and use of computer resources
To facilitate efficient dissemination of messages , notices to air force staff
To provide connectivity to other armed forces and air force personnel in US
To research and read widely about events taking place in US , and outside world . In particular those that are a threat to the US
To perform trade and other commercial activities
The connectivity and...
More Studies on system, proposal, user, AFI, Project Assessment
Customers Who Downloaded This Essay Also Viewed
Related searches on Project Assessment, AFI, Maintenance Engineers
- Network Models Used studies
- sample papers on proposal
- reports on user
- NMCI analysis
- merits of NMCI
- disadvantages of System Proposal
- advantages and disadvantages of system
- NMCI summary
- cause and effect of system
- Network Models Used fallacies
- user test
- advantages of Project Assessment
- system introduction





